This striking feature ceiling, forms part of the Arrivals Court and main reception, visible though a large metal gate from the street – establishing a welcoming space for the residents and their guests as they arrive. The successful installation on site required intricate detailing and sophisticated sequencing of pre-assembled pre-finished sections prior to delivery and final on-site assembly. The fabrication of the double-curved soffit panels and glue-laminated hardwood beams required specialist 3-D veneer and large scale 5-axis CNC manufacturing processes to achieve a seamless flow between the undulating surfaces.