TMJ’s new Spray Shop and Dispatch area if fully underway, excavation has begun!
We currently have a resident corrugated pilling machine at our works at TMJ, a mechanical device used to drive corrugated piles into the soil to provide the foundation support for our new buildings. There will be one long continues corrugated pile the length of the building, to allow for the new steel frame construction. In total we will excavate 2500 tonnes of soil, resulting in the new building being on the same level; our existing workshop.
We look forward to seeing the progress!