Specialist Projects

Olympic Park

Main Contractor:

ISG

Architect:

LOCOG

Location:

Olympic Park, Stratford

Scope of Works

Supplier of Joinery Services (Olympic venues – media platforms and concession pods) to the London 2012 Games.

Project Overview

The result of the Olympic park and all the facilities within were a great success! With the designs being functional rather than necessarily beautiful, the stadium was designed to have legacy and flexibility in mind. The concession stands that are located in pop-up “pods” are on the rim of the Stadium, rather than embedded within it, so no unnecessary mechanical ventilation systems were needed. Concise planning and preparation was imperative for this project.

TMJ’s site team were very effective at communicating with our team and with reporting progress on site. It would be difficult to find another excellent contractor to match the performance of TMJ on this scheme.

Stuart Hartley - ISG