Specialist Projects

The Vortex, Bloomberg HQ

Main Contractor:

Sir Robert McAlpine

Architect:

Foster + Partners

Location:

Cannon Street

Scope of Works

Red Oak panelling, physical attack doors, acoustic wall panelling, insulation, stainless steel C-Trim, structural steel for balustrade, Glulam structure, art work surround.

The time-lapse video below demonstrates concept images through to installation.

Project Overview

This prestigious project was the largest freestanding structure that TMJ have manufactured, made up of 5621 bespoke American Red Oak panels, with over half a million screws used. The project spanned over 1000 days, from concept through to installation. It was a pleasure to work with both Sir Robert McAlpine and Foster + Partners on this incredible project.