Main Contractor:

ISG

Architect:

TP Bennett

Location:

Canary Wharf, London

Scope of Works

Reception desks, vend points, shutters, riser access doors, door sets, vanity units, coat storage units, multi media walls, refreshment points, curved sliding doors, art work walls, credenzas, fabric wall panelling, WC’s, glass panelling, auditorium and acoustic panelling.

Project Overview

The design concept was to create a central focus for the campus with outstanding staff facilities. The fit out consisted of a series of key spaces including a gym, restaurant and auditorium. The auditorium has 265 seats in a ranked formation with state of the art audio visual facilities. The curved ceiling and the use of timber on the side walls provides an attractive contrast and is part of the acoustic strategy for the space.

The quality of the drawings were very good, TMJ became part of the team and worked safely and proactively to deliver a great looking project.

Alex Pirie - Senior Construction Manager